Native technical comparison

ASD 531, 532,
535-3 or 535-4?

The decisive differences are channel structure, sampling-network capability, environment and interface requirements—not headline area alone.

SECURITON SecuriSmoke ASD selection comparison
Decision factorASD 531ASD 532ASD 535-3ASD 535-4
Typical project scaleSmall, concentrated zones and short networksMedium critical spaces and high-sensitivity single-pipe systemsLarge single zones, long networks, high or low-temperature spacesTwo independent zones or separately calculated networks
Detection channels and structure1 channel / 1 sampling network1 channel / 1 sampling network1 high-performance channel / 1 sampling network2 independent channels / 2 sampling networks
Mainland China product-sheet reference800 m²; 80 m; 12 holes1,000 m²; 100 m; 14 holes2,000 m²; 200 m; 30 holes4,000 m²; 400 m; 60 holes
EN 54-20 pipe capability75 m; Class A / B / C holes: 6 / 8 / 12 (Classes A / B / C)120 m; Class A / B / C holes: 8 / 12 / 16 (Classes A / B / C)300 m; Class A / B / C holes: 18 / 56 / 120 (Classes A / B / C)2 × 300 m; Class A / B / C holes: 35 / 112 / 240 total (Classes A / B / C)
Sensitivity and related performanceAlarm 0.02% to 10% obs/m; pre-signal From 0.006%/m; suction > 30 PaAlarm 0.02% to 10% obs/m; pre-signal From 0.002%/m; suction > 100 PaAlarm 0.02% to 10% obs/m; pre-signal From 0.002%/m; suction > 400 PaAlarm 0.02% to 10% obs/m; pre-signal From 0.002%/m; suction > 400 Pa per channel
Environment-10 °C to +55 °C; IP 54; up to 95% RH, non-condensing-20 °C to +60 °C; IP 54; up to 95% RH, non-condensing-30 °C to +60 °C; IP 54; up to 95% RH, non-condensing-30 °C to +60 °C; IP 54; up to 95% RH, non-condensing
Recommended applicationsIndividual server racks, Small equipment rooms, Clean rooms, False ceilingsData rooms, Clean rooms, Laboratories, Telecommunications facilitiesLarge data centres, High-bay storage, Deep-freeze warehouses, Large or high hallsLarge data centres, Two-zone protection, Large logistics facilities, Critical infrastructure
Main limitationsNot intended for long, two-zone or below -10 °C projects; no ASD 532 Ethernet capability.Not intended for two independent channels, very large networks or below -20 °C environments.One independent channel; not a substitute when two zones require separate judgement.Usually excessive for a small single zone; both channels require separate calculation and identification.
Inputs required before selectionConfirm short-network fit and interface, display and temperature requirements.Provide HVAC states, return-air / room strategy and integration requirements.Confirm one large independent zone; provide long-network, low-temperature and contamination conditions.Define two zone boundaries, two PipeFlow models, power and independent alarm logic.
Official sourceSECURITON SecuriSmoke ASD Product Brochure V2.0 EN; official Chinese brochure for separately labelled China valuesSECURITON SecuriSmoke ASD Product Brochure V2.0 EN; official Chinese brochure for separately labelled China valuesSECURITON SecuriSmoke ASD Product Brochure V2.0 EN; official Chinese brochure for separately labelled China valuesSECURITON SecuriSmoke ASD Product Brochure V2.0 EN; official Chinese brochure for separately labelled China values

A candidate model becomes a project decision only after destination-market approval review, a current ASD PipeFlow report and competent fire-strategy coordination.

Selection questions

Direct answers for the first screening step.

What is the key difference between ASD 531 and ASD 532?

ASD 532 offers a lower pre-signal threshold, higher suction pressure, a wider temperature range, a 10-level display and network interfaces. ASD 531 is suited to compact, short-network projects.

How should ASD 535-3 and ASD 535-4 be selected?

Use ASD 535-3 when one independent channel satisfies the project. Evaluate ASD 535-4 when two zones require independent sampling, indication or control.

Can a model be selected by maximum area?

No. Approval, class, pipe length, holes, transport time, airflow, environment, interfaces and maintenance must also be satisfied in a project-specific calculation.